batch job scheduling
常见例句
- The objective of this paper is to minimize the delivery time and the batch scheduling problems with job processing times are the same.
本文主要研究极小化工件配送时间及工件加工时间相同时的分批配送问题。 - Again, when scheduling non-sequential batch jobs, they can all be scheduled at 23:00 because they will be queued one at a time though the job spooler.
同样,在调度不连续的批作业时,可以把它们都安排在 23:00,因为它们会通过假脱机程序每次运行一个。 - In batch scheduling problems, B jobs can be processed on the machine at most, and they are not allowed to be interrupted, removed, or added a new job during processing.
在分批排序问题中,机器一次最多可加工B个工件,工件在加工过程中不允许被打断、移出或加入新工件; 返回 batch job scheduling